We at Elyxxon Engineering & Construction Ltd welcome you to our website. We offer a wide range of products and sevices and our technical team is readily available to support you and help solve your technical and engineering problems. Our products and services are certified to ISO9001:2015 and meet international quality and trade standards and are delivered timely. Our engineering services are not limited to information on this site, please contact us with your specific engineering and technical problems.,
Company Logo
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com
Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com
    Home       History       Products & Services       Photos       Partners & Jobs       Contact Us       Downloads
    Click here to view our privacy statement           Elyxxon Ltd. All Rights Reserved.
Jobs Executed With Dates

 

 

S/N

CLIENT

LOCATION

PROJECT TITLE

   DURATION

1

NNPC  Refinery Complex

(Main Contractor: IPCO WA LTD)

Eleme, Port Harcourt

Sand blasting and painting of Tanks and piping

6 months

June 1999

2

NNPC  Eleme Petrocemical Complex(Main Contractor: Jurak oil Ltd)

Eleme, Port Harcourt

(a) Rehabilitation of Teal Building and Structures (Polypropylene Plant)

(b) Sand blasting and painting  of Teal plant vessels and piping support

April � Nov 2001

3

NNPC  Refinery Complex

(Main Contractor: GLOFELA LTD)

Eleme, Port Harcourt

Construction of Drainage around the Pump House Area

Feb-Mar. 2002

4

NNPC  Eleme Petrocemical Complex

Eleme, Port Harcourt

Procurement of Various TIG Welding consumables (for Olefins Plant Furnace Tube)

2002-2004

5

NAFCON Complex

(Main Contractor: KELLOG B & R Ltd)

Onne

Procurement and Construction of 6-inch stainless steel pipe drainage

Sept 2001

6

Decon Energy Serv Ltd

Trans Amadi, Port Harcourt

Design, and construction of  office block and Warehouse

June �Nov. 2004

7

Nigerian Bottling Company PLC(Main Contractor: WASOLA Ltd)

Trans Amadi, Port Harcourt

Design, construction, and erection of 4-inch SCH 150 process pipeline

(For bottling plant)

Sept.-Nov. 2004

8

Shell Petroleum Dev. Co. Ltd(Main Contractor: Packlinc Ltd)

SPDC Obigbo Manifold, Kom Kom

 

Construction and Erection of Enhanced Manifold Caging

June-Sept. 2005

9

Shell Petroleum Dev. Co. Ltd(Main Contractor: Jurak oil Ltd)

Imo River 2 Flow Station

 

Design, Construction, and Installation of 16-inch Smokeless Flare Stack

Aug-Dec. 2003

10

Nigeria Agip Oil. Co. Ltd (Main Contractor: Jurak oil  Ltd)

Oshie Flow Station

Design, Construction, and Installation of Twin 30-inch Smokeless Flare, Auto Ignition System and Bondwall

2000-2002

11

Addax Petroleum Development Nigeria Limited

Addax OML 124

Fabrication of Pipe clamp of various sizes,(for oil leak containment)

2004-2005

12

Addax Petroleum Development Nigeria Limited

Izombe Flow Station

Rehabilitation of Line Heater Auto Ignition System

2007

13

Addax Petroleum Development Nigeria Limited

Ossu Manifold

Ossu Wells Sand Management OML-124

Dec 07-Mar 2008

14

Addax Petroleum Development Nigeria Limited

Ossu Manifold

Sand Management In OML-124

April-June, 2008

15

Addax Petroleum Development Nigeria Limited

Izombe Flow Station

De-sanding and De-sludging of Tank 7000 barrel crude oil tank

July, 2008

16

Addax Petroleum Development Nigeria Limited

Izombe Flow Station

De-sanding and De-sludging of Tank 25000 barrel crude oil tank

Oct, 2008

17

Addax Petroleum Development Nigeria Limited

Izombe Flow Station

Rehabilitation of Auto Ignition System on the Flare Stack

Ongoing

18

Nigeria Agip Oil. Co. Ltd (Main Contractor: Glofela  Ltd)

Bayelsa Community Ukparatubu

Construction of Classroom blocks

2007

19

Shell Petroleum Development Nigeria Limited (Main Contractor; Paxcy & Horsley  Ltd)

Obigbo Flow Station

{ Field Office Complex)

Installation of Portakabins, Hard Stand & Land-scapping.

April-Sept 2010

20

Addax Petroleum Development Nigeria Limited

Izombe Flow Station

Servicing and repairs of Flame/Flashback Arrestors on Crude Oil Production Vessels

Sept/Nov 2009

21

Addax Petroleum Development Nigeria Limited

OML 124

Design/Installation of Solar Powered System and Street Lighting

June- Sept 2010

22

Nigeran Agip Oil Company Limited

(Main Vendor: Kronos Int�l)

Tebidaba Flow Station

Rehabilitation of Flare Stack; (including Design, fabrication, installation and commissioning of a new flare stack, together with ignition system)

June-September 2011

23

Addax Petroleum Development Nigeria Limited

Izombe Flow Station

Extension of Power Supply to Gate II

Oct-Nov 2011

24

Addax Petroleum Development Nigeria Limited

OML 124

Instllation of Citadel fencing around the Ossu Manifold

Dec2011-Feb2012

25

Imo State Government,

Federal Republic Of Nigeria

Owerri

Electrification of Housing Area F, New Owerri

Sept-Dec, 2009

 